The site occupies approximately 99 hectares and is designated for residential use to be developed in phases over a period of 10 years. The site history ....more>>
![]() ![]()
This site was historically occupied by a number of woollen mills as well as an iron works in the central portion. In addition a river runs adjacent.....more>>
![]()
A number of sites located on the banks of a major waterway were assessed with regard to the risk of flooding. The proposed development of these sites comprised residential homes and given.....more>>
![]()
This site forms an irregular plot of land bounded to the south and east by a small burn. In the eastern part of the site a steep embankment formed.....more>>
![]()
This is a large site with mixed historical use that is being released for residential development. The Stage 1 Desk Study was completed in March 2004 and identified potentially.....more>>
![]()
The site occupies an area that was infilled using colliery waste in the 1980’s. The natural soils beneath the fill comprise mainly sands and gravels, although local areas.....more>>
![]()
A large scale and multi-faceted development for both retail and commercial / leisure purposes was considered on the banks of a major river estuary. The site has a.....more>>
![]()
Following the failure of the southern slope at this complex site in August 2002 it was observed that a main building block was structurally compromised.....more>>
![]()
Investigation and remediation of a former sawmill and industrial estate for residential use. Our input incorporated the development of a remedial strategy including consultation.....more>>
![]() |